Factory & Manufacturing

Power Quality Equipment Manufacturing at YIDEK

See the manufacturing areas behind YIDEK reactors, smart capacitor modules, SVG/APF equipment and high-voltage systems—from component and product assembly to verification, packing and warehouse preparation.

Production areas organized around power quality equipment

YIDEK combines product assembly, production-area organization, verification and logistics preparation within its manufacturing workflow. The photographs below document working areas and products at different stages of completion.

Product-focused areasSeparate visual records for reactors, smart capacitors and power electronics.
Assembly workflowComponents, modules and cabinets shown at different production stages.
Pre-shipment checksAging and functional verification areas support defined release procedures.
Logistics preparationWarehouse, pallet and protective packing areas support order preparation.

What YIDEK Manufactures and Integrates

The scope varies by product configuration. This overview distinguishes component-oriented production from module, cabinet and project-system integration.

Product family Manufacturing / integration scope
Reactors Production, assembly, product identification and applicable post-production verification.
Smart capacitors Component integration, controller assembly, finished-module organization and final unit verification.
SVG / APF Power-module integration, internal connection work, enclosure or cabinet assembly and functional verification.
HV SVG / STATCOM Cabinet integration, system connection work and project-specific configuration.
Capacitor bank systems Component integration, cabinet or system assembly and applicable system-level verification.

Exact production content, supplied components, verification scope and project documentation should be confirmed for the selected product configuration.

01 / REACTOR PRODUCTION

Reactor Production

Dedicated production areas support reactor manufacturing, unit organization and post-production handling for power factor correction and harmonic-control applications.

  • Reactor production area
  • Organized unit staging
  • Production identification
  • Post-production handling
Rows of YIDEK reactors in the production areaReactor production and stagingReactor units organized after productionYIDEK reactor manufacturing area
Reactor ProductionFinished reactor unitsProduction and assembly areaStaging before verification
02 / SMART CAPACITOR ASSEMBLY

Smart Capacitor Module Assembly

Smart capacitor modules bring capacitors, switching, protection and control functions together. Assembly areas organize module components and completed units for subsequent verification.

  • Module assembly
  • Controller integration
  • Component organization
  • Completed-unit staging
Smart capacitor modules in the YIDEK assembly areaSmart capacitor components during assemblySmart capacitor module productionCompleted smart capacitor modules
Smart Capacitor AssemblyModule assemblyControl-component integrationFinished-module staging
03 / SVG & APF ASSEMBLY

SVG and APF Assembly

Power electronic modules and enclosures are assembled in organized work areas, supporting product configurations for reactive power compensation and active harmonic filtering.

  • Power module assembly
  • Enclosure integration
  • Internal connection work
  • Multi-unit production
SVG and APF units on the YIDEK assembly linePower electronic equipment assemblyPower quality cabinet assembly areaSVG APF products during production
SVG / APF AssemblyPower-module integrationInternal connection workCabinet assembly
04 / HIGH-VOLTAGE ASSEMBLY

High-Voltage System Assembly

High-voltage capacitor bank and SVG/STATCOM projects require cabinet-level integration and system assembly according to the applicable electrical design and project configuration.

  • Cabinet assembly
  • System integration
  • Internal connection work
  • Project-specific configuration
Factory Acceptance Preparation for High-Voltage Systems
  • Configuration confirmation
  • Wiring inspection
  • Protection and control check
  • Communication check
  • Applicable functional testing
  • FAT documentation review
The applicable FAT scope and documentation depend on the project specification and confirmed acceptance plan.
High-voltage power quality cabinet assemblyHigh-voltage system integration areaHigh-voltage equipment during assemblyHigh-voltage cabinets in production
High-Voltage System AssemblyCabinet integrationSystem connection workProject configuration
05 / AGING & BURN-IN

Aging and Functional Verification

Finished modules and systems can undergo powered functional checks and defined aging or load/no-load verification procedures according to product and project requirements before release for packing.

  • Powered operation checks
  • Control and indication review
  • Multi-unit verification
  • Pre-packing release

Applicable duration and test conditions depend on the product and project scope.

Power quality products in the aging verification areaEngineer checking equipment during functional verificationMultiple units undergoing aging verificationPre-shipment functional verification area
Aging and Functional VerificationPowered operationMulti-unit verificationRelease before packing
06 / PACKAGING & WAREHOUSE

Packaging and Warehouse Preparation

Completed products are organized in warehouse and staging areas before packing or dispatch preparation. Pallets and protective materials help support handling for the applicable order and transport method.

  • Finished-product staging
  • Warehouse organization
  • Pallet preparation
  • Protective wrapping
YIDEK finished-product warehousePower quality products organized in warehousePalletized equipment prepared in the warehouseWarehouse staging for power quality equipment
Packaging and WarehouseFinished-product stagingPallet preparationProtective packing
07 / SHIPMENT PREPARATION

Packing for Order Dispatch

Final packing is selected according to the product form and order requirements. Completed packages are prepared for onward handling and shipment after the applicable release checks.

  • Order identification
  • Protective packing
  • Handling preparation
  • Dispatch staging

Transport method, packing specification and required documents should be confirmed for each order.

YIDEK equipment prepared for shipmentProtective packing for power quality equipmentPacked equipment in dispatch preparation
Shipment PreparationOrder identificationProtective packingDispatch staging

From incoming component control to dispatch preparation

The exact sequence and inspection scope vary by product and project. Applicable incoming controls may cover supplied electrical components, conductors, cabinets, terminals, cooling components and protection devices before production release.

01Incoming InspectionReview applicable components, identification and supporting information before production use.
02ConfigureConfirm product type, electrical design and project requirements.
03AssembleBuild product components, modules or cabinet structures.
04Wiring / IntegrationComplete internal connections and system integration.
05Functional VerificationPerform applicable electrical, control and indication checks.
06AgingApply the defined powered verification scope where required.
07Final InspectionReview configuration, condition and release requirements.
08PackingPrepare order identification and protective packing.
09DispatchStage released packages for onward handling.

Manufacturing Evidence Beyond the Factory

Continue from the manufacturing view to the verification, documentation and delivered-system evidence relevant to supplier evaluation.

01 / TESTINGTesting & Quality Control

See how products are electrically, environmentally and functionally verified.

View quality control →

Need a manufacturing plan for your power quality project?

Share the required product type, voltage level, operating conditions, quantity and project schedule. The YIDEK team can discuss the appropriate configuration, verification scope and order preparation requirements.

Contact YIDEK

GET A QUOTE

+86 18815165789

[email protected]

GET IN TOUCH NOW